Closed Assam Tenders
- 2026_DHTS_53631_1 - Construction of Multipurpose complex with utility service, multi-media facilities, auditorium, Sericulture Museum cum Heritage Park
(closed 25/09/2026)
- 2026_DHTS_53633_1 - Construction of Boundary Wall
(closed 25/09/2026)
- 2026_DHTS_53629_1 - Construction of Common Facility Centre
(closed 25/09/2026)
- 2026_DHTS_53637_1 - Construction of Eight 8 Nos of Muga Aggregation Centre
(closed 25/09/2026)
- 2026_APDCL_53620_1 - Renovation of Stores with earth filling
(closed 24/09/2026)
- 2026_ICD_53745_1 - Composite Works for DBS
(closed 24/09/2026)
- 2026_ICD_53541_1 - REPAIRING OF APL TOWNSHIP ROAD PHASEIII AT APL NAMRUP
(closed 24/09/2026)
- 2026_ICD_53872_1 - ANNUAL CONTRACT OF REGULAR MAINTENANCE OF HOUSEHOLD ELECTRICAL INSTALLATION AND LT OVERHEAD LINE IN APL TOWNSHIP
(closed 24/09/2026)
- 2026_ACCF_53719_1 - ACCF/ETP/26-27/136
(closed 24/09/2026)
- 2026_UDD_53692_1 - Setting up of Waste to compost facility of capacity and setting up of Waste to Material Recovery Facility of Capacity
(closed 24/09/2026)
- 2026_UDD_53751_1 - Construction of Sludge disposal system with ancillary works for Sivasagar Town Water Supply Scheme under NLCPR to be executed by Sivasagar Municipal Board under 15th FC Tied Fund
(closed 24/09/2026)
- 2026_UDD_53753_1 - Estimates for laying, testing and commissioning of CWPM for Zone-III and interlinking of clear water pumping main to existing OLD ESR near SIVA DOWL and interlinking of delivery line of Thanamukh and Phukan Nagar old water distribution for SibsagarMB
(closed 24/09/2026)
- 2026_SEEDE_53390_1 - Lot 2- GIS and Remote Sensing Lab
(closed 24/09/2026)
- 2026_PWBNH_53738_1 - Renovation with installation of sound system with Acoustic facility for echo proof of sounds and other necessary requirements in Lecture Hall-IV at Tezpur Medical College and Hospital, Tezpur.
(closed 24/09/2026)
- 2026_PWBNH_53899_1 - Construction of E-lab at Govt. ITI Nagaon District
(closed 24/09/2026)
- 2026_PWBNH_53989_1 - Establishment of Radha Rukuni Ethnic Handloom and Textile Development Centre II, Bozaltoli, under a one time special grant for Development of Moran Community for the year 2023-24 phase III
(closed 24/09/2026)
- 2026_GMC_53744_1 - Door to Door Collection and Transportation of Municipal Waste in Package 3- Wards Covered- 7,8,14 and 15
(closed 24/09/2026)
- 2026_GMC_53744_2 - Door to Door Collection and Transportation of Municipal Waste in Package 4- Wards Covered- 13,11 and 12
(closed 24/09/2026)
- 2026_GMC_53744_3 - Door to Door Collection and Transportation of Municipal Waste in Package 13- Wards Covered- 43,44 and 47
(closed 24/09/2026)
- 2026_FEAP_53715_1 - Hiring of Vehicle on Rate Contract Basis on Monthly/Daily Use(As and when required)
(closed 24/09/2026)
- 2026_FD_53691_1 - 112 Nos of Infrastructure for Fisheries Development Projects
(closed 24/09/2026)
- 2026_BoTC_53885_1 - Installation of drinking water facility at educational institutes Kokrajhar MB.
(closed 24/09/2026)
- 2026_PWD_53737_1 - Construction of RCC Box culvert(2-3X3) at 7th Km of Makum Bajalani Road under SOPD-G for the year 2025-26 under Tinsukia, Doomdooma ,Makum and Sadia Territorial Road Division in Makum LAC.
(closed 24/09/2026)
- 2026_APGCL_53734_1 - SUPPLY OF DIFFERENT GRADES OF SHELL LUBRICANTS
(closed 24/09/2026)
- 2026_AEGCL_53449_1 - Diversion of 132KV Lakwa-Mariani Line at Loc. No. 205C to 208A to protect the line from erosion by Dikhow River near Chandbesa, Nazira
(closed 24/09/2026)
- 2026_AEGCL_53523_1 - Upgradation/Replacement of existing Substation Automation System at 132KV Matia GSS and 132KV Kamakhya GIS AEGCL
(closed 24/09/2026)
- 2026_PHED_53548_1 - Construction of 2.0 lakh liters capacity underground service reservoir including extension of different diameter of G.I. distribution pipe line at different location and providing FHTCs under Tiling Gaon PWSS
(closed 23/09/2026)
- 2026_APDCL_53583_1 - CGM(D)/UAR/APDCL/Wildlife protection/Part U/2024-25/ 24
(closed 23/09/2026)
- 2026_GSCT_53851_1 - Selection of Consultant for preparation of Detailed Project Report for Brahmaputra Riverfront Development Project Phase-II under Guwahati Smart City Limited with an cost of Rs 3.81 Crores (inclusive of GST)
(closed 23/09/2026)
- 2026_BoTC_53699_1 - Construction Solar Powered Standalone DW facility with Ordex System at Boropara AC 128529869 under the Award of 15th FC Tied Grant for the year 2025-26 during 2026-27.
(closed 23/09/2026)
- 2026_BoTC_53696_1 - Construction Solar Powered Standalone DW facility with Ordex System at Agrang Pt.I AC 128529855 under the Award of 15th FC Tied Grant for the year 2025-26 during 2026-27.
(closed 23/09/2026)
- 2026_BoTC_53697_1 - Construction Solar Powered Standalone DW facility with Ordex System at Burichourang AC 128529879 under the Award of 15th FC Tied Grant for the year 2025-26 during 2026-27.
(closed 23/09/2026)
- 2026_UDD_53818_1 - Rejuvenation of water body at dhakuakhana town, dist Lakhimpur under AMRUT 2 with operation and maintenance of 1 year
(closed 23/09/2026)
- 2026_PWD_53714_1 - Fresh and Legacy Waste Dumpsite Remediations through biomining and disposal of Residual Waste in Dhakuakhana under the Tied Grants of 15th Finance Commission for the year 2025-26 under Dhakuakhana Municioal Board in the District of Lakhimpur
(closed 23/09/2026)
- 2026_PWD_53567_2 - Housekeeping and Sanitation Services at the Chief Ministers Secretariat, Dibrugarh for the year 2026 2027
(closed 23/09/2026)
- 2026_PWBNH_53779_1 - Development of Mahapurush Sri Sri Anirudhadev Janmakhetra at Narayanpur, Lakhimpur, Assam on Engineering, Procurement and Construction (EPC) Mode 1.
(closed 23/09/2026)
- 2026_PWBNH_53980_1 - Construction of Bir Raghab Moran and others 8 Nos Statues and Memorial Park at Gelapukhuri, Tinsukia Phase II RSL 22
(closed 23/09/2026)
- 2026_MAU_54001_1 - Acoustic work and installation of Sound system in the auditorium, Madhabdev University
(closed 23/09/2026)
- 2026_HFWD_53612_1 - Supply, Installation and Commissioning of BMD for GMCH in Assam.
(closed 23/09/2026)
- 2026_HFWD_53985_1 - Supply of ORS
(closed 23/09/2026)
- 2026_HFWD_54037_1 - Supply of 4 nos of Drugs
(closed 23/09/2026)
- 2026_WREAP_53690_1 - Engagement of Internal Auditor for FY 2026-27
(closed 23/09/2026)
- 2026_DoWR_53871_1 - Procurement of Diesel Driven Trolley Mounted Dewatering Pumps along with accessories for dewatering of storm water / accumulated water logged from vulnerable and low lying areas of Guwahati city 2026-27.
(closed 23/09/2026)
- 2026_AEGCL_53683_1 - CONSTRUCTION OF AGM OFFICE, APPROACH ROAD FROM NH TO AGM OFFICE, REVETMENT WALL,INTERNAL DRAINAGE AND ROAD SIDE DRAIN, SITE CLEARANCE BY DISMANTLING AND DEMOLISHING OF ABONDONED QUARTER AT 132/33 kV PANCHGRAM SUBSTATION AEGCL HAILAKANDI ASSAM
(closed 23/09/2026)
- 2026_AAU_53582_1 - Construction of Integrated shed for Compost, Vermicompost and Enriched Compost unit (for Deptt. of Soil Science) at SCSCA AAU Dhubri
(closed 23/09/2026)
- 2026_AAU_52743_2 - Repairing renovation of Girls Hostel under ICAR Dev. Grant at SCS College of Agriculture, AAU, Dhubri
(closed 23/09/2026)
- 2026_AAU_52742_2 - Repairing renovation of Boys Hostel under ICAR Dev. Grant at SCS College of Agriculture, AAU, Dhubri
(closed 23/09/2026)
- 2026_AAU_52815_2 - Construction of Mushroom Spawn Laboratory Unit (for Deptt. of P.P.) at SCSCA AAU Dhubri
(closed 23/09/2026)
- 2026_ID_53654_4 - Cart Mounted Multifunctional IS with Two Boring, Solar Powered Mobile Lift Irrigation Scheme, Solar Powered STW (45m) and Solar Powered STW (54m) Irrigation Schemes RIDF-XXXII (NABARD) for the year 2026-27 (Package No.-4)
(closed 23/09/2026)
- 2026_ID_53654_2 - Cart Mounted Multifunctional IS with Two Boring, Solar Powered Mobile Lift Irrigation Scheme and Solar Powered STW Irrigation Scheme under RIDF-XXXII (NABARD) for the year 2026-27 (Package No.-2)
(closed 23/09/2026)