Closed Jammu and Kashmir Tenders
- 2026_PWDJK_324396_1 - Upgradation of 03 Nos Operation Theatres as Ductless Modular OTs in Pediatrics Surgery at SMGS Hospital, Jammu
(closed 26/09/2026)
- 2026_IFC_322541_2 - Supply installation testing and commissioning of 10 Cusec 10 Mtr Head Horizontal pumping units(01No.) for Lift irrigation Scheme Khumina Drought of MISD Sumbal
(closed 26/09/2026)
- 2026_IFC_322404_3 - LIS Shalteng Providing and fitting of 30 Cusec Vertical Pumping Unit along with Starters Cables etc.
(closed 26/09/2026)
- 2026_FD_325275_1 - Maintenance and Upgradation of Division office Building Zangli by way of Roof Tiles Painting Repair of Wash Rooms and other required works etc as per Estimate Scheme CAPEX 2026 27
(closed 26/09/2026)
- 2026_PDD_324190_1 - Segregation of 11kV Kehribal- Feeder at 10 plus 6.3MVA Receiving Station Gopalpora
(closed 26/09/2026)
- 2026_PDD_324349_1 - Maintenance and repair of LT ABC System falling under the jurisdiction of ED-3rd Shreen Bagh Srinagar (Rate Contract)
(closed 26/09/2026)
- 2026_IFC_324779_1 - Repair maintenance of damaged components of 7.2 cusecs discharge 94.7 mtr. Head HSC pumps 02 No and Air Release Valves fitted to 914 mm dia Rising Main at different prescribed RDs at Raya Lift irrigation Station
(closed 26/09/2026)
- 2026_PWDJK_324958_1 - CAMC of Aircon Make Lift installed at EWS Girls Hostel of GMC Jammu for the period of three years
(closed 26/09/2026)
- 2026_PWDJK_324953_1 - CAMC of Aircon Make Lift installed at EWS Boys Hostel of GMC Jammu for the period of three years
(closed 26/09/2026)
- 2026_PWDJK_325447_1 - Macadamisation of Main Road District Headquarters along with Main markets with allied links
(closed 26/09/2026)
- 2026_IFC_324180_1 - MID/AN/43
(closed 26/09/2026)
- 2026_IFC_325159_1 - LIS Gundi Rehman - Supply, Installation, Testing and Commissioning of 10 Cusec, 15M Head Horizontal Pumping Equipment at LIS Gundi Rehman.
(closed 26/09/2026)
- 2026_PDD_325149_1 - Dismantling reerectionof 0.450Km 11KV line on 9 mtr PCC pole using ACSR Dog from Army unit premises at Raipur.in electric sub divisionJanipur on turnkey basis
(closed 26/09/2026)
- 2026_PWDJK_325279_1 - Repair and Service of DRR 1948 S/C DRR 25473 B/M DRR 2223 S/C and TVR 42213
(closed 26/09/2026)
- 2026_PHE_311967_1 - Construction of Gravel Packed Production Tube Well at Water Supply Scheme Arakhashi Pora District Anantnag.
(closed 26/09/2026)
- 2026_PHE_316831_2 - Construction of Borewell at Nagbal (Vail Nagbal, K Pora in District Anantnag).
(closed 26/09/2026)
- 2026_PHE_321781_1 - Augmentation of drinking water facilities to Gujar Basti Check Sangri Khonmoh by way of bore well including pipe network pump station and other related works.
(closed 26/09/2026)
- 2026_PHE_321788_1 - Construction of 01 No. 125mm dia, 90 mtr deep Machine Drilled Tube Well at Astanpora Brein District Srinagar.
(closed 26/09/2026)
- 2026_IFC_325301_1 - Replacement of One motor for Lift Irrigation scheme Verinag
(closed 26/09/2026)
- 2026_RDPR_325267_4 - Const of Tile work at Shamshan Ghat Thub wno 3, Pyt Makwal, Block Mandal Phallian under DCB for the year 2026-27
(closed 26/09/2026)
- 2026_RDPR_325054_1 - Construction of Retaining wall near house of Mohd Shafi and others Mohalla Seinar Salotri Salotri District Poonch Pyt. Salootri Block Poonch Under UT Capex Budget TSP Year 2026-27
(closed 25/09/2026)
- 2026_RDPR_325054_2 - Construction of Bridal Path main road upto Mohalla Takia W.No 7 Salotri District Poonch Pyt. Salootri Block Poonch Under UT Capex Budget TSP Year 2026-27
(closed 25/09/2026)
- 2026_RDPR_325054_14 - Construction of Protection wall Near H/o Mohd Shafi S/o Bagh Hussain and others W.No.1 Salotri Poonch Pyt. Salootri Block Poonch Under UT Capex Budget TSP Year 2026-27
(closed 25/09/2026)
- 2026_RDPR_325054_6 - Construction of R/Wall near W.No 5 Ajote Poonch Pyt. Ajote Block Poonch Under UT Capex Budget TSP Year 2026-27
(closed 25/09/2026)
- 2026_RDPR_325054_7 - Construction of R/Wall near H/o Mohd Qasim S/o Mir Baz W.No 4 Karmara Poonch Pyt. Karmara Block Poonch Under UT Capex Budget TSP Year 2026-27
(closed 25/09/2026)
- 2026_RDPR_325054_8 - Construction of Protection wall near H/o Imran Khan S/o Said Mohammad W.No.3 Koss allian and others Kossallian Poonch Pyt. Kossallian Block Poonch Under UT Capex Budget TSP Year 2026-27
(closed 25/09/2026)
- 2026_RDPR_325054_9 - Construction of Bathroom Tanki Nr. H/o Mohd Rafiq R/o Salotri (Singer) Salotri Poonch Pyt. Salootri Block Poonch Under UT Capex Budget TSP Year 2026-27
(closed 25/09/2026)
- 2026_RDPR_325054_10 - Construction of Compound wall Grave yard Karmara W.No.4 Mohd Shafi Mier and others Karmara Poonch Pyt. Karmara Block Poonch Under UT Capex Budget TSP Year 2026-27
(closed 25/09/2026)
- 2026_RDPR_325054_11 - Construction of B/Path Nr. Sain Fakar Din Baitakh to Mohalla Pattan and others W.No. 5 Ajote Poonch Pyt. Ajote Block Poonch Under UT Capex Budget TSP Year 2026-27
(closed 25/09/2026)
- 2026_RDPR_325054_15 - Construction of Protection wall near H/o Mohd Younis Bagh Hussain and others Salotri Poonch Pyt. Salootri Block Poonch Under UT Capex Budget TSP Year 2026-27
(closed 25/09/2026)
- 2026_RDPR_325054_16 - Construction of Tandi Bathroom Nr. H/o Abdul Majeed Gorse Gala and others Khari Poonch Pyt. Khari Block Poonch Under UT Capex Budget TSP Year 2026-27
(closed 25/09/2026)
- 2026_RDPR_325054_19 - Construction of R/wall Nr. H/o Mohd latief S/o Ghulam Din and others R/o Kossallian Poonch Pyt. Kossallian Block Poonch Under UT Capex Budget TSP Year 2026-27
(closed 25/09/2026)
- 2026_RDPR_325054_17 - Construction of B/Wall near H/o Salamat Ali S/o Mohd Fazal Khari W.No.5 and others Khari Poonch Pyt. Khari Block Poonch Under UT Capex Budget TSP Year 2026-27
(closed 25/09/2026)
- 2026_RDPR_325054_20 - Construction of R/Wall Nr. H/o Sain Munir Moh. Bakerwala Kossallian Poonch Pyt. Kossallian Block Poonch Under UT Capex Budget TSP Year 2026-27
(closed 25/09/2026)
- 2026_RDPR_325054_21 - Construction of R/Wall Nr. H/o Rashid PHE Karmara Poonch Pyt. Karmara Block Poonch Under UT Capex Budget TSP Year 2026-27
(closed 25/09/2026)
- 2026_RDPR_325054_22 - Construction of Road from Main Road to Mohalla Bajara Pyt Karmara District Poonch Block Poonch Under UT Capex Budget TSP Year 2026-27
(closed 25/09/2026)
- 2026_RDPR_325054_23 - Construction of R/Wall Nr. H/o Mushtaq Hussain S/o Sher Mohd Degwar terwan and others W.No.1 Poonch Pyt Degwar Terwan Block Poonch Under UT Capex Budget TSP Year 2026-27
(closed 25/09/2026)
- 2026_RDPR_325054_3 - Construction of Bridal Path with tile work from Captain Mond Rashid and others to Mohhalla Budhana W.No 5 Karmara District Poonch Pyt. Karmara Block Poonch Under UT Capex Budget TSP Year 2026-27
(closed 25/09/2026)
- 2026_RDPR_325054_4 - Construction of Bridal Path upto Mohhalla Bakarwala W.No. 3 Near H/o Munir Hussain and others Salotri District Poonch Pyt. Salootri Block Poonch Under UT Capex Budget TSP Year 2026-27
(closed 25/09/2026)
- 2026_RDPR_325054_5 - Constriction of R/wall near H/o Mohd Kalu W.No. 5 Ajote Poonch Pyt. Ajote Block Poonch Under UT Capex Budget TSP Year 2026-27
(closed 25/09/2026)
- 2026_RDPR_325054_24 - Construction of R/Wall around Eid Gah Degwar Terwian Poonch Pyt Degwar Terwan Block Poonch Under UT Capex Budget TSP Year 2026-27
(closed 25/09/2026)
- 2026_RDPR_325054_25 - Construction of Drain Nr. H/o Mumtaz Kouser W/o Gulzar Ahmed W.No. 1 Panchayat Bela Chowana Village Khanater Poonch Pyt Khanater Bela Chowana Block Poonch Under UT Capex Budget TSP Year 2026-27
(closed 25/09/2026)
- 2026_RDPR_325014_74 - RDDDC2627106265-(CONST OF STEPS AND WAZUKHANA NEAR MASJID SHAREEF KHATEEJAT UL KUBRA AT KUCHMULLA TRAL)
(closed 25/09/2026)
- 2026_RDPR_325014_63 - RDDDC2627115286 Installation of borewell NLO Prince Firdous Iqbal S/o, Ab Ahad Dar R/o, Dalipora at Tengpuna Pulwama
(closed 25/09/2026)
- 2026_RDPR_325014_44 - RDDDC2627104569 -(Constt OF BOREWELL NEAR NUND RESHI MASJID SHARIEF AT GABARPORA (SHADIM))
(closed 25/09/2026)
- 2026_RDPR_325014_40 - RDDDC2627104245 -(INSTALLATION OF BOREWELL NEAR HOUSE OF M HUSSAIN BHAT S O ALI BHAT AT SHEIKH MOHALLA ZIRGUND BELLOW (SHADIM))
(closed 25/09/2026)
- 2026_RDPR_325014_39 - RDDDC2627104244 -(BOREWELL NEAR HOUSE OF GH HASSAN BHAT S O ALI BHAT AT SHEIKH MOHALLA ZIRGUND BELLOW (SHADIM))
(closed 25/09/2026)
- 2026_RDPR_325014_49 - RDDDC2627104313 -(CONST OF LANE R WALL FROM HOUSE OF GH HASSAN SHEIKH TO BASHIR AHMAD GANAIE VIA AIRTEL TOWER (SHADIM))
(closed 25/09/2026)
- 2026_RDPR_325014_38 - RDDDC2627104243 -(INSTALLATION OF BOREWELL NEAR HOUSE OF IQAL AH GANIE AT GANAIE MOHALA BELLOW (SHADIM))
(closed 25/09/2026)
- 2026_RDPR_325014_48 - RDDDC2627104314 -(CONST OF LANE FROM HOUSE OF GH RASOOL MIR TO HOUSE OF SAJAD AHMAD DAR VIA FAYAZ AH DAR AKRAM (SHADIM))
(closed 25/09/2026)